AD 1.1 AERODROME AVAILABILITY AND CONDITIONS OF USE
ICAO Standards and Recommended Practices contained in the ANNEX 14 are applied to the maximum extent possible.
ANNEX 14 - Aerodromes Volume I & II
Doc 9157 - Aerodrome Design Manual(Part 1 to 6)
Doc 9137 - Airport Services Manual(Part 1 to 9)
Civil aircraft operators must get an prior approval from the ROK MND(Ministry of National Defense) in accordance with the ‘Agreement for use of aerodromes between ROK MND and ROK MOLIT’ in order to operate at military aerodromes. No prior approval is required in case of an emergency.
Military aerodromes available for civil aircraft are joint civil and military airports such as RKJJ, RKPS, RKPK, RKNW, RKTN, RKTU and RKTH.
The range of overload aircraft operations should be the bounds of ACN, which is within 10%(Flexible Pavement), 5%(Rigid Pavement) of PCN.
The annual number of overload aircraft operations should not exceed 5% of the total annual aircraft movements and should disperse throughout a year.
Overload aircraft operations should be avoided following periods.
Thaw season : 3. 1 ~ 5. 31
Rainy season : 6. 1 ~ 8. 31
If a sign of problem is found such as crack, breakage, or sinking of pavement due to the overload aircraft operations, the overload aircraft operations should not be reimposed until appropriate pavement strengthening work has been completed.
Despite above criteria, overload aircraft operations in excess of the range should be only carried out in an emergency.
Aerodrome |
Location Indicator |
Remarks |
---|---|---|
Incheon |
RKSI |
apply within 5% of PCN |
Gimpo |
RKSS |
apply within 5% of PCN |
Gimhae |
RKPK |
apply within 5% of PCN |
Daegu |
RKTN | |
Sacheon |
RKPS |
apply within 5% of PCN |
Ulsan |
RKPU | |
Pohang Gyeongju |
RKTH |